top of page

Driveway Installation

driveway installation by J316 Excavation
driveway installation by J316 Excavation
Building a driveway is more than just pouring concrete or laying gravel—it’s about site prep, base compaction, drainage, and proper installation to prevent cracking, erosion, or uneven settling.

Planning and Design

Before any construction begins:

  • Determine location and size: Length, width, and slope

  • Check local regulations: Permits, easements, and drainage requirements

  • Choose materials: Asphalt, concrete, gravel, pavers, or other surfaces

  • Plan for drainage: Avoid water pooling near structures

Excavation and Grading

The driveway base is created:

  • Excavate the area to the required depth based on material type

  • Shape the surface with the correct slope for drainage (usually 1-2% away from buildings)

  • Compact soil to prevent settling and cracking

Edging or Forms (Optional)

Depending on material:

  • Install forms for concrete or asphalt to define edges

  • Add edging stones or curbs for gravel or paver driveways

Finishing Touches

Final adjustments ensure function and longevity:

  • Ensure proper drainage away from structures

  • Seal concrete or asphalt surfaces if required

  • Clean the area and remove excess materials

Site Preparation

The area is prepared for construction:

  • Clear vegetation, rocks, and debris

  • Mark edges and layout using stakes or paint

  • Remove topsoil if needed to reach a stable base

Base Installation

A strong base is essential for durability:

  • Lay and compact aggregate base material (gravel or crushed stone)

  • Multiple layers may be added, each compacted thoroughly

  • Ensures proper support for the surface material

Surface Installation

Final driveway surface is installed:

  • Gravel: Spread and compact evenly

  • Concrete: Pour, level, and smooth; add expansion joints

  • Asphalt: Lay hot mix and compact

  • Pavers: Lay individually on sand base and compact

Curing and Use

Some surfaces require curing:

  • Concrete typically needs several days to set

  • Asphalt can usually handle light traffic after 24-48 hours

  • Gravel or paver driveways may settle over time and require minor adjustments

I'm a testimonial. Click to edit me and add text that says something nice about you and your services. Let your customers review you and tell their friends how great you are.

Robb Walters

bottom of page